Kendall decided to dress herself the other day. Her onsie had to be snapped on the outside of her leggin's. She also wanted red socks with pink squeaker shoes.
Finished up roofing on Saturday with minimal weather affecting the house during the framing process. Kyle was very happy as it didn't rain or snow to get all the flooring wet. All the furnace duct material is delivered and waiting to be installed. Electrical and plumbing should also begin very shortly.
They have also installed all the windows, except the block windows that go in the master bath.
Back covered patio.
No comments:
Post a Comment